top of page

Calibre is providing preliminary design for 38th Avenue in Denver from Himalaya to Picadilly. The contract includes right-of-way (ROW) and easement services, CLOMR, wetlands and Threatened and Endangered Species (T&ES) report, construction documents, design survey, stormwater management plan, roadway design, drainage, water and sewer infrastructure, erosion control, overall utility plan, and traffic signal plan for Picadilly.

 

The roadway design consists of 5,300 LF of four lane arterial roadway.

38th Avenue from Himalaya to Picadilly, Denver, CO

  • Services Project Type

    Water

    Storm

    Grading & Earthwork

    Roadway, Parking, Driveways

    Cost Estimation & Construction Services

    Infrastructure

     

Anchor 1
bottom of page