Calibre updated and improved the existing Road and Bridge Service Center. This included the renovation of a three bay heavy equipment maintenance building, the addition of two bays to the existing salt/sand barn, removal of existing deicer tanks, the removal and replacement of a fuel station and wash area, and the replacement of a temporary mobile unit with a permanent facility to house personnel. Services included civil engineering, grading, erosion control, drainage, site planning, full spectrum detention, water and sewer systems, irrigation, concrete pad, and water quality facility.
Site: 22.8 Acres
Buildings: 5
Fuel Building: 3,511 SF
Vehicle Wash Facility: 6,141 SF
Equipment Building | Sweeper: 8,617 SF
Fleet Support Shop: 9,410 SF
Crew | Ops Building: 32,930 SF
top of page
Anchor 1
bottom of page