Calibre provided civil and structural engineering services for the utility design of a 47-building crew camp residential complex on 7.5 acres. Design services occurred during post-construction as a check of as-built conditions. Design services included checking capacity of sanitary sewer drain fields, water usage calculations, and updating the utility plan. Additional services will include a water inventory of existing conditions, calculation of water capacity and flow demand, hydraulic analysis, and potential tie-in to a future proposed water main
top of page
Anchor 1
bottom of page